Once CCA had finished repairing and applying CoolBond® Cooling Membrane to roof areas we were tasked with repairing and coating the walls of the building.
The brickwork had cracked in many areas as the building was over five decades old.
The added challenge to coating the wall was the raked joints of the brickwork as they were very deep and the mortar had deteriorated.
CCA repaired all damaged brickwork and were able to get great coverage over the dark wall colours with 2 coats of our CoolBond® Cooling Wall Membrane.
The CoolBond® application will provide long term industrial grade protective, waterproofing layer over the wall structure, combined with CoolBond® heat re-radiating abilities adding to cooling inside warehouse tenancies.
Project Gallery
Testimonial From This Customer:
Hi Sean and Terry,
It has been a pleasure to have you on site and couldn’t thank you enough. Your recommendations and outstanding work have enhanced our building immensely and the feedback from our tenants also confirms this.